The original (version one) instructions included the instructions to remove the connector from the Z limit switch wiring to thread the wires through the hole in the gantry plate - I suggest that this be added to the instructions here to avoid people drilling the hole out.
This wire really needs to be clipped or taped to the EDGE of the X gantry plate - it is fairly common for the X drag chain to rub on it and wear away the insulation.
For those of us who provide support to our fellow workbee users it would be really helpful if you could highlight changes introduced by new versions of build manuals.
Beta version - if no wcs selected in Fusion will revert to G54 (wcs 1)
Telling people to switch from usb to ethernet at this stage might be helpful?
A prominent note to inform people about the lag before the User Interface responds would save a lot of support calls.
The original (version one) instructions included the instructions to remove the connector from the Z limit switch wiring to thread the wires through the hole in the gantry plate - I suggest that this be added to the instructions here to avoid people drilling the hole out.
Alex.
This wire really needs to be clipped or taped to the EDGE of the X gantry plate - it is fairly common for the X drag chain to rub on it and wear away the insulation.
Alex Chambers.
For those of us who provide support to our fellow workbee users it would be really helpful if you could highlight changes introduced by new versions of build manuals.