Skip to main content

v1.0

Major VersionM

by Robert

  1. At this stage your PSU-Output-Power-Cable will be inserted inside the Y-Axis Drag Chain. Place the Power Supply at the Rear of the WorkBee CNC Machine next to this cable. Use the red switch on the side select the input voltage for your local power.
    • At this stage your PSU-Output-Power-Cable will be inserted inside the Y-Axis Drag Chain.

    • Place the Power Supply at the Rear of the WorkBee CNC Machine next to this cable.

    • Use the red switch on the side select the input voltage for your local power.

    • Plug the PSU-Output-Power-Cable into the female connector on the Pre-Assembled Power Supply.

    • Plug the mains cable into the IEC Inlet on the Pre-Assembled Power Supply.

    • Do not plug the mains cable into your wall socket at this point.

Conclusion

Thanks for following the guide. Any issues, please contact us!

25 other people completed this guide.

Ryan Lock

Member since: 04/11/2018

48,468 Reputation

22 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 6

All Time: 1,730